Authorities on Sunday closed a foot over-bridge at Dadar station towards the south of the platforms, in order to fix a ramp and a staircase that connects it. As no alternative was provided, the other FOB on the south side was packed to the brim, despite it being a Sunday, as commuters found it difficult to cross the station area or reach the Central Railway side
from Mumbai News: Latest Mumbai News Headlines & Live Updates from Mumbai - Times of India https://ift.tt/2HER1Sc
Post Top Ad
Responsive Ads Here
Tuesday, March 19, 2019
Dadar stn overcrowded as FOB shut for repairs
Tags
# Mumbai news
Share This
About Simon Toppo
Mumbai news
Labels:
Mumbai news
Subscribe to:
Post Comments (Atom)
Post Bottom Ad
Responsive Ads Here
Author Details
Templatesyard is a blogger resources site is a provider of high quality blogger template with premium looking layout and robust design. The main mission of templatesyard is to provide the best quality blogger templates which are professionally designed and perfectlly seo optimized to deliver best result for your blog.
No comments:
Post a Comment